7 Bishopsgate – New Stripout Project

16,276 sqft Stripout in 2 Weeks.. Here is the finished product…

16,276 sqft Stripout in 2 Weeks preparing for a fitout by Ambit Moat. This will be an upgrade of the entire Architectural, Some Mechanical & Electrical systems.

KEY FEATURES:

Turnkey CAT A+

  • Open plan working
  • Meeting rooms
  • Reception
  • Break out and collaboration spaces
  • Tea points
  • Services design and installation
  • IT and AV design and installation
  • Furniture specification and supply

About 7 Bishopsgate Level 4

The 4th floor will offer 7,901 sq ft of truly exceptional space, with plenty of meeting rooms and a multifunctional, private wellness room. The space will feature the chic-est high quality fixtures and fittings, all chosen to give the office a certain ‘je ne sais quoi’. Fully fitted and ready for occupancy in Q4 2023.
All the smart technology you’ll need such as super-fast fibre broadband has been installed throughout.
If you’re ready to move to a forward-thinking new office in an incredibly well-connected area, then it’s time to say ‘Bonjour’ to 7 Bishopsgate.

We will be reusing… on another project…

  • Furniture
  • Kitchen & White Goods
  • Power packs
  • Carpet
  • Ceiling Baffles
  • etc…
Shopping Basket